Guangzhou City Northern Ring Road
-
Trees and bushes plants along the road to provide fresher air and better scenery for road users. Also, the trees act as acoustic barrier which minimize the noise disturbance to nearby residents. Lamppost and lightings intensity is adjusted according to the illumination in different weathers and climates which could save energy
|
Zhujiang power Station - Phase I & II
- The desulphurization facilities have been operating for 4 x 300 MW. Since 2006-2007 which help reduce sulphur dioxide emissions significantly
- The denitrogen project has been launched for 4 x 300 MW which helps reduce nitroxide emissions substantially after operation
|
Chengdu Jintang Power Plant
- During the construction of the power plant, the desulphurization facilities is installed which helps reduce suplur dioxide emissions significantly
|
Macau Power
-
Installs the technology of Combined Cycle Gas Turbines for power generation using natural gas during the last extension of Coloane Power Station of Macau Power. It lights natural gas, the cleanest source of fossil fuels which contributes to cleaner air
-
Initiates the "Rational Use of Energy" programme which includes auditing customer's installations and recommending improvements
-
Set up the Safety, Health, Environment and Quality Office in 2001 to oversee
issues concerning safety, health, environment and quality
-
Implements waste management plan, chemical product management plan and energy
efficiency studies
-
Adopts new Fluidized Bed System technology to incinerate used oil to improve
emission
-
Collaborates with the Macau Meteorological and Geophysical Bureau to closely
monitor the impact of its emissions on local air quality
|
Macau Water Plant
-
Installs water hammer equipment to avoid pipe bursts and water leakage due to
excessive pressure caused by hydraulic vibration
-
Adopts a quasi-close loop system in its 410 km-long distribution network, which
allows repairs and maintenance to be performed with minimal disruption to water
supply system
-
Effectively reduced water loss ratio from nearly 40% in 1982 to below 10%
|
Sanya Water Plant
-
Sets up specialized working teams for checking and maintaining its 462-km
pipeline
-
Regulates procedures of laying, managing and maintenance of pipelines
-
Uses geographical information systems to improve scientific management for the
network
-
Implements structured leakage detection and regular valve replacement
-
Significantly reduced non-revenue water ratio from 25% to 17%
|
Xiamen New World Xiangyu Terminals Co., Ltd.
-
All industrial waste generated is handled cautiously in an effort to minimize the potential impact on the environment. Electrical parts, electrolyte and waste oil are collected and handled by professional agents. Also, tires are retreaded before disposing to extend their useful life and reduce solid waste
- Implements a zoning lighting system for the light poles to reduce the electricity consumption of yard lighting by 21% in 2009
- All scrapped tyres are retreaded and recycled
|